Traditional runners and Dynamics Block
Calculate your savings
Enter your own production data and see at once what you gain in labour, quality and capacity with Dynamics Block frames.
Results
Enter the tables per year and the labour cost per hour to see the results.
Our assumptions
- Frame preparation with Dynamics Block: 5 min per table
- Less assembly time: 85%
- Less top preparation: 10%
- Fewer defects and returns: 90%
- Minutes saved per table = (today’s frame time − Dynamics Block frame time) + assembly × assembly reduction + top preparation × top reduction
- Hours freed per year = tables per year × minutes saved per table
- Labour saving = hours freed × labour cost per hour
- Lower defect cost = tables × defect rate × defect reduction × (unit cost + labour per table)
- Extra capacity = tables today’s labour hours can make − tables today
- Net yearly gain = savings − tables × (Dynamics Block price − today’s unit cost); without a price, the price difference is excluded
The results are an estimate based on your data and these average values; talk to our engineers for a firm assessment.